Civil Engineering Gate Yearwise
Civil Gate 2025 Set-2
Civil Gate 2024 Set-1
Civil Gate 2024 Set-2
Civil Gate 2023 Set-1
Civil Gate 2023 Set-2
Civil Gate 2022 Set-1
Civil Gate 2022 Set-2
Civil Gate 2021 Set-1
Civil Gate 2021 Set-2
Civil Gate 2020 Set-1
Civil Gate 2020 Set-2
Civil Gate 2019 Set-1
Civil Gate 2019 Set-2
Civil Gate 2018 Set-1
Civil Gate 2018 Set-2
Civil Gate 2017 Set-1
Civil Gate 2017 Set-2
Civil Gate 2016 Set-1
Civil Gate 2016 Set-2
Civil Gate 2015 Set-1
Civil Gate 2015 Set-2
Civil Gate 2014 Set-1
Civil Gate 2014 Set-2
Civil Gate 2013
Civil Engineering GATE 2015 Set-1 Questions with Answer
Ques 40 Geotechnical Engineering
Which of the following statements is NOT correct?
Ques 41 Geotechnical Engineering
An earth embankment is to be constructed with compacted cohesionless soil. The volume of the embankment is 5000 m3 and the target dry unit weight is 16.2 kN/m3. Three nearby sites (see figure below) have been identified from where the required soil can be transported to the construction site. The void ratios (e) of different sites are shown in the figure. Assume the specific gravity of soil to be 2.7 for all three sites. If the cost of transportation per km is twice the cost of excavation per m3 of borrow pits, which site would you choose as the most economic solution? (Use unit weight of water = 10 kN/m3)

Ques 42 Geotechnical Engineering
A water tank is to be constructed on the soil deposit shown in the figure below. A circular footing of diameter 3 m and depth of embedment 1 m has been designed to support the tank. The total vertical load to be taken by the footing is 1500 kN. Assume the unit weight of water as 10 kN/m3 and the load dispersion pattern as 2V:1H. The expected settlement of the tank due to primary consolidation of the clay layer is _______ mm.

52.5 is the correct answer.
Ques 43 Geotechnical Engineering
A 20 m thick clay layer is sandwiched between a silty sand layer and a gravelly sand layer. The layer experiences 30 mm settlement in 2 years.

4.44 is the correct answer.
Ques 44 Geotechnical Engineering
A non-homogeneous soil deposit consists of a silt layer sandwiched between a fine-sand layer at top and a clay layer below. Permeability of the silt layer is 10 times the permeability of the clay layer and one-tenth of the permeability of the sand layer. Thickness of the silt layer is 2 times the thickness of the sand layer and two-third of the thickness of the clay layer. The ratio of equivalent horizontal and equivalent vertical permeability of the deposit is _______.
10.9 is the correct answer.
Ques 45 Geotechnical Engineering
A square footing (2 m x 2 m) is subjected to an inclined point load, P as shown in the figure below. The water table is located well below the base of the footing. Considering one-way eccentricity, the net safe load carrying capacity of the footing for a factor of safety of 3.0 is _______ kN.
The following factors may be used:
Bearing capacity factors: Nq = 33.3, Nγ = 37.16; Shape factors: Fqs = Fγs = 1.314; Depth factors: Fqd = Fγd = 1.113; Inclination factors: Fqi = 0.444, Fγi = 0.02

439.15 is the correct answer.
Ques 46 Hydrology
The two columns below show some parameters and their possible values.

Ques 47 Hydrology
In a catchment, there are four rain-gauge stations, P, Q, R, and S. Normal annual precipitation values at these stations are 780 mm, 850 mm, 920 mm, and 980 mm, respectively. In the year 2013, stations Q, R, and S, were operative but P was not. Using the normal ratio method, the precipitation at station P for the year 2013 has been estimated as 860 mm. If the observed precipitation at stations Q and R for the year 2013 were 930 mm and 1010 mm, respectively; what was the observed precipitation (in mm) at station S for that year?
1093.33 is the correct answer.
Ques 48 Hydrology
The 4-hr unit hydrograph for a catchment is given in the table below. What would be the maximum ordinate of the S-curve (in m3/s) derived from this hydrograph?

22 is the correct answer.
Ques 49 Structural Engineering
Consider the singly reinforced beam shown in the figure below:

Ques 50 Structural Engineering
For the beam shown below, the stiffness coefficient K22 can be written as ____________ kN-m.

5 is the correct answer.
Ques 51 Structural Engineering
The development length of a deformed reinforcement bar can be expressed as (1 / k)(Φσs / τbd). From the IS: 456-2000, the value of k can be calculated as _______.
6.38 to 6.42 is the correct answer.
Ques 52 Structural Engineering
Two triangular wedges are glued together as shown in the following figure. The stress acting normal to the interface, σn is _______ MPa.

0 is the correct answer.

Total Unique Visitors