Civil Engineering Gate Yearwise
Civil Gate 2025 Set-2
Civil Gate 2024 Set-1
Civil Gate 2024 Set-2
Civil Gate 2023 Set-1
Civil Gate 2023 Set-2
Civil Gate 2022 Set-1
Civil Gate 2022 Set-2
Civil Gate 2021 Set-1
Civil Gate 2021 Set-2
Civil Gate 2020 Set-1
Civil Gate 2020 Set-2
Civil Gate 2019 Set-1
Civil Gate 2019 Set-2
Civil Gate 2018 Set-1
Civil Gate 2018 Set-2
Civil Gate 2017 Set-1
Civil Gate 2017 Set-2
Civil Gate 2016 Set-1
Civil Gate 2016 Set-2
Civil Gate 2015 Set-1
Civil Gate 2015 Set-2
Civil Gate 2014 Set-1
Civil Gate 2014 Set-2
Civil Gate 2013
Civil Engineering GATE 2024 Set-I Questions with Answer
Ques 1 Construction Management
Consider the statements P and Q.
P: In a Pure project organization, the project manager maintains complete authority and has maximum control over the project.
Q: A Matrix organization structure facilitates quick response to changes, conflicts, and project needs.
Which one of the following options is CORRECT?
Ques 2 Construction Management
Consider the following data for a project of 300 days duration.
Budgeted Cost of Work Scheduled (BCWS) = Rs. 200
Budgeted Cost of Work Performed (BCWP) = Rs. 150
Actual Cost of Work Performed (ACWP) = Rs. 190
The 'schedule variance' for the project is _______.
Ques 3 Construction Management
A critical activity in a project is estimated to take 15 days to complete at a cost of Rs. 30,000. The activity can be expedited to complete in 12 days by spending a total amount of Rs. 54,000. Consider the statements P and Q.
P: It is economically advisable to complete the activity early by crashing, if the indirect cost of the project is Rs. 8,500 per day.
Q: It is economically advisable to complete the activity early by crashing, if the indirect cost of the project is Rs. 10,000 per day.
Which one of the following options is CORRECT?
Ques 4 Engineering Mathematics
A partial differential equation

Ques 5 Engineering Mathematics
The statements P and Q are related to matrices A and B, which are conformable for both addition and multiplication.
P: (A + B)T = AT + BT
Q: (AB)T = ATBT
Which one of the following options is CORRECT?
Ques 6 Engineering Mathematics
The function f(x) = x3 - 27x + 4, 1 ≤ x ≤ 6 has _______.
Ques 7 Engineering Mathematics
Consider two Ordinary Differential Equations (ODEs):
P: dy⁄dx = x4+3x2y2+2y4⁄x3y
Q: dy⁄dx = -y2⁄x2
Which one of the following options is CORRECT?
Ques 8 Engineering Mathematics
In a sample of 100 heart patients, each patient has 80% chance of having a heart attack without medicine X. It is clinically known that medicine X reduces the probability of having a heart attack by 50%. Medicine X is taken by 50 of these 100 patients. The probability that a randomly selected patient, out of the 100 patients, takes medicine X and has a heart attack is _______.
Ques 9 Engineering Mathematics
Three vectors $vec{p}$, $vec{q}$, and $vec{r}$ given as

Ques 10 Environmental Engineering
What is the CORRECT match between the air pollutants and treatment techniques given in the table?

Ques 11 Environmental Engineering
Which one of the following products is NOT obtained in anaerobic decomposition of glucose?
Ques 12 Environmental Engineering
A hypothetical multimedia filter, consisting of anthracite particles (specific gravity: 1.50), silica sand (specific gravity: 2.60), and ilmenite sand (specific gravity: 4.20), is to be designed for treating water/wastewater. After backwashing, the particles should settle forming three layers: coarse anthracite particles at the top of the bed, silica sand in the middle, and small ilmenite sand particles at the bottom of the bed. Assume the following:
(i) Slow discrete settling (Stoke's law is applicable)
(ii) All particles are spherical
(iii) Diameter of silica sand particles is 0.20 mm
The CORRECT option fulfilling the diameter requirements for this filter media is _______.
Ques 13 Environmental Engineering
A circular settling tank is to be designed for primary treatment of sewage at a flow rate of 10 million liters/day. Assume a detention period of 2.0 hours and surface loading rate of 40000 liters/m2/day. The height (in meters) of the water column in the tank is _______. (rounded off to 2 decimal places).
3.47 is the correct answer.