Civil Engineering Gate Yearwise
Civil Gate 2025 Set-2
Civil Gate 2024 Set-1
Civil Gate 2024 Set-2
Civil Gate 2023 Set-1
Civil Gate 2023 Set-2
Civil Gate 2022 Set-1
Civil Gate 2022 Set-2
Civil Gate 2021 Set-1
Civil Gate 2021 Set-2
Civil Gate 2020 Set-1
Civil Gate 2020 Set-2
Civil Gate 2019 Set-1
Civil Gate 2019 Set-2
Civil Gate 2018 Set-1
Civil Gate 2018 Set-2
Civil Gate 2017 Set-1
Civil Gate 2017 Set-2
Civil Gate 2016 Set-1
Civil Gate 2016 Set-2
Civil Gate 2015 Set-1
Civil Gate 2015 Set-2
Civil Gate 2014 Set-1
Civil Gate 2014 Set-2
Civil Gate 2013
Civil Engineering Gate 2024 Set-1 Questions with Answer
Ques 1 GATE 2024 SET-1
Consider the statements P and Q.
P: Client's Preliminary Estimate is used for budgeting costs toward the end of planning and design phase.
Q: Client's Detailed Estimate is used for controlling costs during the execution of the project.
Which one of the following options is CORRECT?
In civil engineering project management, cost estimates are prepared at different stages of a project for different purposes.
Statement P — False
A Preliminary Estimate is prepared at the very beginning of the planning phase, not toward the end. At this early stage, detailed drawings and specifications are not yet available, so the estimate uses broad parameters like plinth area rate, cubic content method, or unit cost of similar past projects. Its purpose is to assess financial feasibility and secure initial administrative approval. Saying it is used "toward the end of planning and design" is incorrect. P is false.
Statement Q — True
A Detailed Estimate is prepared after all drawings, designs, and specifications are complete. It calculates item-wise quantities from drawings and applies current schedule of rates to each item, becoming the officially sanctioned project cost. During execution this figure serves as the benchmark against which actual expenditures are monitored and controlled. Q is true.
Correct answer: D — P is FALSE and Q is TRUE ✓
Ques 2 GATE 2024 SET-1
The initial cost of an equipment is Rs. 1,00,000. Its salvage value at the end of accounting life of 5 years is Rs. 10,000. The difference in depreciation (in Rs.) computed using 'double-declining balance method' and 'straight line method of depreciation' in Year-2 is _______. (in positive integer).
Ques 3 GATE 2024 SET-1
Concrete of characteristic strength 30 MPa is required. If 40 specimens of concrete cubes are to be tested, the minimum number of specimens having at least 30 MPa strength should be _______.
Ques 4 GATE 2024 SET-1
Which one of the following statements related to bitumen is FALSE?
Ques 5 GATE 2024 SET-1
The following figure shows the arrangement of formwork for casting a cantilever RC beam.

Ques 6 GATE 2024 SET-1
The smallest positive root of the equation
x5 - 5 x4 - 10 x3 + 50 x2 + 9 x - 45 = 0
lies in the range _______.
Ques 7 GATE 2024 SET-1
The second-order differential equation in an unknown function 𝑢: 𝑢(𝑥, 𝑦) is defined as
∂2𝑢/∂𝑥2 = 2
Assuming 𝑔: 𝑔(𝑥), 𝑓: 𝑓(𝑦), and ℎ: ℎ(𝑦), the general solution of the above
differential equation is
Ques 8 GATE 2024 SET-1
The probability that a student passes only in Mathematics is 1⁄3. The probability that the student passes only in English is 1⁄6. The probability that the student passes in both of these subjects is 4⁄9. The probability that the student will pass in at least one of these two subjects is _______.
Ques 9 GATE 2024 SET-1
For the following partial differential equation,
x ∂2f⁄∂x2 + y ∂2f⁄∂y2 = x2+y2⁄2
which of the following option(s) is/are CORRECT?
Ques 10 GATE 2024 SET-1
Consider the data of f(x) given in the table.
The value of f(1.5) estimated using second-order Newton's interpolation formula is _______. (rounded off to 2 decimal places).

Ques 11 GATE 2024 SET-1
What are the eigenvalues of the matrix

Ques 12 GATE 2024 SET-1
A vector field $vec{p}$ and a scalar field r are given by
$vec{p}=(2x^{2}-3xy+z^{2})hat{i}+(2y^{2}-3yz+x^{2})hat{j}+(2z^{2}-3xz+x^{2})hat{k}$ r = 6x2 + 4y2 - z2 - 9xyz - 2xy + 3xz - yz
Consider
P: The divergence of vector field $vec{p}$ is zero.
Q: The curl of vector field r is a null vector.
Which one of the following options is CORRECT?
Ques 13 GATE 2024 SET-1
The return period of a large earthquake for a given region is 200 years. Assuming that earthquake occurrence follows Poisson's distribution, the probability that it will be exceeded at least once in 50 years is _______%. (rounded off to the nearest integer).