Mining Engineering Gate Yearwise
Mining Eng. Gate 2025
Mining Eng. Gate 2024
Mining Eng. Gate 2023
Mining Eng. Gate 2022
Mining Eng. Gate 2021
Mining Eng. Gate 2020
Mining Eng. Gate 2019
Mining Eng. Gate 2018
Mining Eng. Gate 2017
Mining Eng. Gate 2016
Mining Eng. Gate 2015
Mining Eng. Gate 2014
Mining Eng. Gate 2013
Mining Eng. Gate 2012
Mining Eng. Gate 2011
Mining Eng. Gate 2010
Mining Eng. Gate 2009
Mining Eng. Gate 2008
Mining Eng. Gate 2007
Mining Engineering Gate 2026 Questions with Answer
Ques 40 GATE 2026
In an underground mine atmosphere, the alcohol of a Kata thermometer took 60 s to fall from 38 °C to 35 °C. The Kata factor of the thermometer is 480 milli-calories cm-2. The Kata cooling power, in W m-2, is _______________. (rounded off to one decimal place)
Ques 41 GATE 2026
In an underground coal mine, the air quantities QA and QB passes through ventilation districts A and B, respectively as shown, with a pressure drop of ΔP across them. The air quantity in district B is to be increased to Q′B by installing a booster fan, as shown, without affecting the air quantity in ventilation district A. The capacity of booster fan (PB) can be expressed as

Ques 42 GATE 2026
Match the shaft sinking method with its applicability.
Shaft sinking method:
| Method | Applicability |
|---|---|
| (P) Piling system | (1) Strata consisting of alternate strong and loose soil, and drum sinks down by its own weight |
| (Q) Caisson method | (2) Sinking through the loose ground near the surface |
| (R) Cementation | (3) Heavily watery strata, including quick sand |
| (S) Freezing | (4) Fissured water bearing strata without running sand |
Ques 43 GATE 2026
A shovel needs to be selected from four models of different capacities, S1 to S4, for loading of dumpers. The operational data for the shovel-dumper combination are provided. The mean arrival rate of the dumpers at the loading point is 5 per hour and the waiting cost of dumper is ₹ 200 per hour. The inter-arrival time of dumpers and loading time of shovel follows exponential distribution. Ignoring the shovel hiring cost, the shovel type that will have minimum total cost (waiting and operating cost) is
| Model | Operating cost (₹/hr) | Mean loading rate (dumpers/hr) |
|---|---|---|
| S1 | 800 | 8 |
| S2 | 850 | 9 |
| S3 | 920 | 10 |
| S4 | 1000 | 11 |
Ques 44 GATE 2026
The in-situ stresses are determined by Flat-jack method by making three slots (P, Q, and R) on the wall (ABCD) of a mine gallery as shown. The in-situ stresses σP, σQ, and σR are determined at slot-P, slot-Q, and slot-R, respectively (slot-P vertical, slot-Q horizontal, slot-R at 45°). If σP > σQ, and σR = 0, the shear stress on the wall is

Ques 45 GATE 2026
A closed-circuit self-contained breathing apparatus (SCBA) contains 2 liters of O2 at 200 bar. If a miner consumes O2 at a rate of 2 liters min-1, the maximum duration that the apparatus can supply O2, in min, is _______________. (answer in integer)
Ques 46 GATE 2026
The borehole data for resource estimation for an iron ore deposit are shown. The average grade of the deposit, in %, is _______________. (rounded off to two decimal places)

Ques 47 GATE 2026
A mine workshop needs to assign 4 jobs to 4 service engineers. The cost for performing a job by an individual service engineer is given. A typical job can be assigned to only one service engineer. If the service engineer S1 cannot perform the job J3, and S3 cannot perform the job J4, the optimal cost for completion of jobs is _______________. (answer in integer)
| Service Engineer | J1 | J2 | J3 | J4 |
|---|---|---|---|---|
| S1 | 50 | 50 | --- | 20 |
| S2 | 70 | 40 | 20 | 70 |
| S3 | 90 | 30 | 50 | --- |
| S4 | 70 | 20 | 60 | 30 |
Ques 48 GATE 2026
A plug dam is to be constructed in a mine gallery of size 3.5 m × 2.5 m. The interfacial shear strength between the surrounding rock and plug dam is 1.0 MPa. The minimum thickness of the dam, in m, to withstand a water pressure of 10.0 MPa, is _______________. (rounded off to two decimal places)
Ques 49 GATE 2026
A shovel costing (P) ₹ 20 crores has a salvage value (S) of ₹ 2 crores with a useful life (n) of 10 years. The annual depreciation is evaluated using declining balance method as given by
Depreciation rate = 1 − (S/P)1/n
The depreciated cost of the shovel, in crores, in its 2nd year is ₹ _______________. (rounded off to two decimal places)
Ques 50 GATE 2026
An economic block model along with extraction sequence is shown. The numbers given at the centre of the block represent the year of extraction, and that at the corners represent the block economic value in ₹ (lakhs). If the discount rate is 10%, the net present value (NPV), in lakhs, is ₹________. (rounded off to two decimal places)

Ques 51 GATE 2026
A main mechanical ventilator installed for an underground mine develops a pressure of 25 mm wg. A natural ventilation pressure (NVP) of 15 mm wg acting in the mine aids the ventilator, and a total 500 m3 min-1 of air is circulated in the mine. Considering the same NVP aiding the ventilator, the pressure required, in mm wg, to be generated by the ventilator to circulate 1000 m3 min-1 of air, is _______________. (answer in integer)
Ques 52 GATE 2026
Dust particles from a blasting operation rise up in the atmosphere to a height of 500 m. The viscosity of air is 1.80 × 10-5 kg m-1 s-1. Assume the particles have quiescent settling (no turbulence) in atmosphere. Neglecting air density, the settling time, in days, of a dust particle of 2.5 µm diameter and 3600 kg m-3 density is _______________. (rounded off to two decimal places)
Total Unique Visitors