Mining Engineering Gate 2017 Questions with Answer

Ques 27 GATE 2017


The operating conditions of a rotary rock drill are: applied thrust: 6.75 kN, revolution: 180 rpm, and penetration rate: 0.15 m/min. The work done per revolution in N-m is


(5.15 to 6.0) is the correct answer.

Ques 28 GATE 2017


The Absolute amount of energy and density of a booster and ANFO are given below. The Relative bulk strength of booster is


(113 to 116 or 1.13 to 1.16) is the correct answer.

Ques 29 GATE 2017


A deeply seated ore body dips at 70° having an average width of 60 m. The ore body, hanging wall, and footwall are competent. The suitable stoping method for this ore body is

A

Post pillar cut and fill

B

Shrinkage stoping

C

Transverse sublevel caving

D

Transverse sublevel open stoping


(d) is the correct answer.

Ques 30 GATE 2017


The results of the crossing point temperature experiments for coal A and B are shown in the figure.

A

coal A is more prone to spontaneous heating than coal B

B

coal B is more prone to spontaneous heating than coal A

C

coal A is more prone to coal dust explosion than coal B

D

coal B is more prone to coal dust explosion than coal A


(b) is the correct answer.

Ques 31 GATE 2017


The "yellow boy" formed due to acid mine drainage mainly consists of

A

Ferrous hydroxide

B

Ferrous sulfate

C

Ferric hydroxide

D

Ferric sulfate


(c) is the correct answer.

Ques 32 GATE 2017


A double ended ranging drum shearer is employed in a longwall mine of face length 150 m. The mining height is 3.5 m and depth of the web cut is 0.76 m. The cycle time for unidirectional cutting is 40 min. Considering bulk density of the coal to be 1.4 t/m3, hourly production from the face in tonne is ________.


(835 to 840) is the correct answer.

Ques 33 GATE 2017


The strength of a stranded wire rope is proportional to

A

the diameter of the rope

B

square of the diameter of the rope

C

square root of the diameter of the rope

D

inverse of the diameter of the rope


(b) is the correct answer.

Ques 34 GATE 2017


A 20 m thick and 30 m wide confined aquifer has two monitoring wells spaced 500 m apart along the direction of groundwater flow. The difference in water level between the wells is 2 m. The hydraulic conductivity is 50 m/day. The rate of flow in m3/day is

A

4

B

12

C

40

D

120


(d) is the correct answer.

Ques 35 GATE 2017


The following readings refer to a reciprocal leveling at staff stations A and B respectively:

The reduced level (RL) of staff station B in m is ________


(123.0 to 124.5) is the correct answer.

Ques 36 GATE 2017


The areas within the contour lines of a proposed site for an overburden dump are as follows:

The total volume of overburden in cubic meter that could be dumped within the 120 m and 195 m contour levels is


(174765 to 174765) is the correct answer.

Ques 37 GATE 2017


Total ore mined from a sub-level open stope of a copper deposit is measured to be 100000 tonne. The ore recovery and ore dilution during stoping are 90% and 20% respectively. The in situ Cu grade of the ore in the stope is 0.65%. The selling price of copper is Rs. 400/kg of metal. Ignoring any other metal losses in the downstream process of the ore, the revenue generated by selling the ore in Crores of rupees is


(20 to 23) is the correct answer.

Ques 38 GATE 2017


The block grade model of an ore deposit is shown in the figure below. The relationship between block value per tonne (Bv) in rupees and the block grade in percentage (x) is given below:

If each square block contains 1000 tonne of material and the overall pit slope angle is 45°, the total value of the pit determined by the floating cone algorithm in Lakhs of rupees is _________.


(25 to 27) is the correct answer.

Ques 39 GATE 2017


A mine is being developed by bord and pillar method with a gallery size of 4.8 m×2.4 m. The mine operates in 3 shifts per day and 6 faces are blasted per shift. The average pull per round of blast is 1.2 m and the bulk density of coal is 1.4 t/m3. If the OMS is 2.5, then the average manpower deployed in the development section per shift is ____________.


(46 to 47) is the correct answer.

Unique Visitor Count

Total Unique Visitors

Loading......