Mining Engineering Gate 2017 Questions with Answer
Ques 14 GATE 2017
Two machines M1 and M2 are able to execute any of four jobs P, Q, R and S. The machines can perform one job on one object at a time. Jobs P, Q, R and S take 30 minutes, 20 minutes, 60 minutes and 15 minutes each respectively. There are 10 objects each requiring exactly 1 job. Job P is to be performed on 2 objects, Job Q on 3 objects, Job R on 1 object and Job S on 4 objects. What is the minimum time needed to complete all the jobs?
Ques 15 GATE 2017
The bar graph below shows the output of five carpenters over one month, each of whom made different items of furniture: chairs, tables, and beds.

i. The number of beds made by carpenter C2 is exactly the same as the number of tables made by carpenter C3.
ii. The total number of chairs made by all carpenters is less than the total number of tables.
Which one of the following is true?
Ques 16 GATE 2017
In a PERT network, the "time estimates" of an activity are the following: Optimistic time - 2 days, Most likely time - 4 days, and Pessimistic time - 12 days. The expected time and standard deviation of the activity in days are respectively
Ques 17 GATE 2017
Components of a 2-D stress tensor in Cartesian coordinate are σxx=5.0 MPa, σyy=-10.0 MPa, and τxy=2.0 MPa. The traction vector (T→) in MPa acting on a plane having outward normal n^=(√3/2)i^-(1/2)j^ is
Ques 18 GATE 2017
A multi-point borehole extensometer is used to monitor
Ques 19 GATE 2017
The failure load of a point load test specimen having diameter 45 mm is 6000 N. The uncorrected point load index in MPa is ________.
Ques 20 GATE 2017
Minerals A and B are produced from a deposit. Minerals A and B will be called coproducts if
Ques 21 GATE 2017
Semi-variogram modeling is used for reserve estimation of mineral deposit by
Ques 22 GATE 2017
Which one of the following does NOT belong to the direct operating cost of a mine?
Ques 23 GATE 2017
Lane's algorithm is applied to determine
Ques 24 GATE 2017
In an underground coal mine a driller, wearing personal protective equipment, was going to workplace along the travelling roadway. A piece of rock fell down from the roof and hit the person on head causing serious injury. The cause of accident is
Ques 25 GATE 2017
The magnetic bearing of a line is 65°30'. If the declination is 4°30'W the true bearing of the line in degrees is
Ques 26 GATE 2017
A vertical photograph of a 40 m high hill is taken from 4.4 km height. If the focal length of the camera is 15 cm, the scale of the photograph is