Ques 1 Gate 2020 Set-2
While I agree ________ his proposal this time, I do not often agree ______ him.
Ques 2 Gate 2020 Set-2
The recent measures to improve the output would ______ the level of production to our satisfaction.
Ques 3 Gate 2020 Set-2
It was estimated that 52 men can complete a strip in a newly constructed highway Q.2 connecting cities P and Q in 10 days. Due to an emergency, 12 men were sent to another project. How many number of days, more than the original estimate, will be required to complete the strip?
Ques 4 Gate 2020 Set-2
Select the word that fits the analogy:
White : Whitening : : Light : ________.
Ques 5 Gate 2020 Set-2
In one of the greatest innings ever seen in 142 years of Test history. Ben Stokes upped Q.7 the tempo in a five-and-a-half hour long stay of 219 balls including 11 fours and 8 sixes that saw him finish on a 135 not out as England squared the five-match series. Based on their connotations in the given passage, which one of the following meanings DOES NOT match?
Ques 6 Gate 2020 Set-2
Climate change and resilience deal with two aspects - reduction of sources of nonrenewable Q.9
energy resources and reducing vulnerability of climate change aspects. The terms
'mitigation' and 'adaptation' are used to refer to these aspects, respectively.
Which of the following assertions is best supported by the above information?
Ques 7 Gate 2020 Set-2
It was estimated that 52 men can complete a strip in a newly constructed highway Q.2 connecting cities P and Q in 10 days. Due to an emergency, 12 men were sent to another project. How many number of days, more than the original estimate, will be required to complete the strip?
Ques 8 Gate 2020 Set-2
Which of the following conditions is used lo determine the stable equilibrium of all partially submerged floating bodies?
Ques 9 Gate 2020 Set-2
In the space above the mercury column in a barometer tube, the gauge pressure of the vapour is
Ques 10 Gate 2020 Set-2
In Materials Requirement Planning, if the inventory holding cost is very high and the setup cost is zero, which one of the following lot sizing approaches should be used?
Ques 11 Gate 2020 Set-2
For an air-standard Diesel cycle,
Ques 12 Gate 2020 Set-2
The process, that uses a tapered horn to amplify and focus the mechanical energy for machining of glass, is
Ques 13 Gate 2020 Set-2
Two plates, each of 6 mm thickness, are to be butt-welded. Consider the following
processes and select the correct sequence in increasing order of size of the heat affected
zone
1. Arc welding
2. MIG welding
3. Laser beam welding
4. Submerged arc welding