Textile Engineering > GATE 2018 > Combing
An eight head comber is running at 400 nips/min. The lap fed is 60 kilotex and noil extracted is 20%. If the feed/nip is 7 mm, then with machine utilization of 80%, the production rate (in kg/h), accurate to one decimal place, is

Correct : 51.0 to 52.0

Similar Questions

In cotton combing process, the counter-feed system gives
#448 MCQ
In cotton combing process, the counter-feed system gives
#448 MCQ
In cotton combing process, the counter-feed system gives
#448 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......