Textile Engineering > GATE 2017 > Draw Frame
The tenacity of
P. Carded sliver
Q. First drawn sliver
R. Second drawn sliver
S. Combed sliver
follows the order
P. Carded sliver
Q. First drawn sliver
R. Second drawn sliver
S. Combed sliver
follows the order
Correct : a
Similar Questions
Assuming no fibre loss in draw frame, if draft is equal to doubling then the delivered sliver, as compared to fed sliver, will exhibit
In a 3 over 3 drafting arrangement, the diameter of all bottom rollers is 28 mm. The back zone draft is 1.3 and the front zone draft is 6. If the back bottom ro...
A twin-delivery drawframe, running at a delivery speed of 800 m/min with an efficiency of 95%, is producing 5.9 ktex sliver. The rate of production of the drawf...
Total Unique Visitors
Loading......