Mining Engineering > GATE 2025 > Ore Dilution
In a sublevel stope, a ringhole blast round is designed for winning 2500 tonne of ore with 8.0% metal content. The blast results into breakage of 90.0% of the design blast round. Overbreak of 250 tonne wallrock with 0.5% metal content dilutes the blasted ore. The total metal content, in tonne, considering 95% recovery of the blasted muck from the stope, is ______ (rounded off to 2 decimal places)

Correct : 169.58

Similar Questions

A trapezium has vertices marked as P, Q, R and S (in that order anticlockwise). The side PQ is parallel to side SR. Further, it is given that, PQ = 11 cm, QR...
#4 MCQ
Mosquitoes pose a threat to human health. Controlling mosquitoes using chemicals may have undesired consequences. In Florida, authorities have used geneticall...
#6 MCQ
Consider the following inequalities. (i) 2π‘₯ βˆ’ 1 > 7 (ii) 2π‘₯ βˆ’ 9 < 1 Which one of the following expressions below satisfies the above two inequalities?
#7 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......