Mining Engineering > GATE 2025 > Underground Mining
A continuous miner serves two shuttle cars of 12 tonne capacity each. Shuttle cars I and II operate with a total cycle time of 12 minutes and 15 minutes respectively, which includes loading time of 8 minutes for each car. The production rate of the continuous miner, in tonne/hour, is ______ (rounded off to 2 decimal places)

Correct : 75.00

Similar Questions

A double ended ranging drum (DERD) shearer uni-directionally cuts coal in a longwall panel having the following details:Shearer drum diameter =1.4mPanel dimensi...
#560 NAT
A double ended ranging drum (DERD) shearer uni-directionally cuts coal in a longwall panel having the following details:Shearer drum diameter =1.4mPanel dimensi...
#560 NAT
A double ended ranging drum (DERD) shearer uni-directionally cuts coal in a longwall panel having the following details:Shearer drum diameter =1.4mPanel dimensi...
#560 NAT

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......