Mining Engineering > GATE 2025 > Surface Mining
In a shovel dumper combination, the loading time of a dumper is 3 minutes. The shovel serves 8 dumpers. If the cycle time of a dumper including its loading time is 22 minutes, the waiting time of a dumper, in minute, is ______ (in integer)

Correct : 0

Similar Questions

Data related to a surface miner operation are given below - Drum width (m)=3.0 Average cutting depth (cm)=20 Average cutting speed (m/min)=25 Length of pit...
#100 Fill in the Blanks
Identify the WRONG statement: Break-even stripping ratio
#132 MCQ
In a surface mine bench, overburden is removed by the shovel-dumper combination. For the dumper: Minimum number of dumpers required to avoid idle time of th...
#167 Fill in the Blanks

Related Topics