Mining Engineering > GATE 2025 > Errors in Surveying
Match the source of error with the corresponding correction in surveying with steel tape.
Source of errorType of correction
(P) Sag(1) Only Positive (+)
(Q) Temperature(2) Only Negative (-)
(R) Pull greater than standard pull(3) Either positive or negative (+ or -)
A
P→1, Q→2, R→3
B
P→1, Q→3, R→2
C
P→2, Q→3, R→1
D
P→2, Q→1, R→3

Correct : c

Similar Questions

A trapezium has vertices marked as P, Q, R and S (in that order anticlockwise). The side PQ is parallel to side SR. Further, it is given that, PQ = 11 cm, QR...
#4 MCQ
Mosquitoes pose a threat to human health. Controlling mosquitoes using chemicals may have undesired consequences. In Florida, authorities have used geneticall...
#6 MCQ
Consider the following inequalities. (i) 2π‘₯ βˆ’ 1 > 7 (ii) 2π‘₯ βˆ’ 9 < 1 Which one of the following expressions below satisfies the above two inequalities?
#7 MCQ

Related Topics

GATE Mining Engineering 2025 Q20 steel tape surveying tape corrections in surveying sag correction temperature correction pull correction GATE MN 2025 surveying error corrections

Unique Visitor Count

Total Unique Visitors

Loading......