Mining Engineering > GATE 2024 > Blasting
In a development coal face, 12 holes are drilled and charged with explosive. Holes are initiated with electric delay detonators connected in series. The length of a detonator lead wire is 1.5 m. The length of the blasting cable is 120 m.
Data are as given:
The total resistance of the circuit in Ω, is __________. (round off up to 2 decimals)
Data are as given:

Correct : 20.40
Similar Questions
In an opencast coal mine, blast vibrations are measured at two locations, A and B simultaneously for a maximum charge per delay (Q) of 1200 kg as given.
Ass...
The blast pattern of a coal face shown in the figure Front view Top view Side view represents _______.
A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill hole is 110 mm. The drilling length is 8.8 m including subgrade of 10%. T...
Total Unique Visitors
Loading......