Mining Engineering > GATE 2024 > Blasting
In a development coal face, 12 holes are drilled and charged with explosive. Holes are initiated with electric delay detonators connected in series. The length of a detonator lead wire is 1.5 m. The length of the blasting cable is 120 m.
Data are as given:
The total resistance of the circuit in Ω, is __________. (round off up to 2 decimals)

Correct : 20.40

Similar Questions

In an opencast coal mine, blast vibrations are measured at two locations, A and B simultaneously for a maximum charge per delay (Q) of 1200 kg as given. Ass...
#51 Fill in the Blanks
The blast pattern of a coal face shown in the figure Front view Top view Side view represents _______.
#67 MCQ
A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill hole is 110 mm. The drilling length is 8.8 m including subgrade of 10%. T...
#115 Fill in the Blanks

Related Topics

mining engineering gate 2024 circuit resistance calculation explosive drilling electric detonators series blasting cable resistance mining engineering circuit detonator lead wire resistance GATE mining engineering 2024 explosives engineering