Mining Engineering > GATE 2023 > Underground Coal Mining
A continuous miner served by two shuttle cars produces 240 tonne/hr. The capacity of each shuttle car is 10 tonne. When a single shuttle car operates, the cycle time becomes 4 min. In case one of the shuttle cars is under break-down, the reduction in hourly production from that of two cars in percent is ________. [rounded off to 1 decimal place]

Correct : 16.7

Similar Questions

A Bord and Pillar panel is developed at a depth of 250 m in a flat coal seam. The vertical stress gradient is 0.027 MPa/m. If the strength of a square pillar is...
#43 Fill in the Blanks
For a continuous miner (CM) panel, the following data are given. Data related to CM A Table: Assume, unit weight of coal is 1.4 tonne/m3 and its swell facto...
#54 Fill in the Blanks
'Critical subsidence has occurred on the surface due to mining of a flat longwall panel at a depth of 200 m. The width of the panel is 150 m. The maximum width...
#87 Fill in the Blanks

Related Topics

continuous miner production shuttle car capacity mining engineering GATE 2023 production reduction calculation cycle time reduction mining engineering problems continuous miner efficiency GATE mining engineering 2023