Data related to a surface miner operation are given below -
Drum width (m)=3.0
Average cutting depth (cm)=20
Average cutting speed (m/min)=25
Length of pit (m)=500
Turning time (min)=2
Truck exchange time (s)=30
Truck capacity (m3)=15
Considering in situ volume, the production rate of the surface miner in m3/hr, is ____________. [rounded off to 1 decimal place]

Correct : 843.8

Similar Questions

Identify the WRONG statement: Break-even stripping ratio
#132 MCQ
In a surface mine bench, overburden is removed by the shovel-dumper combination. For the dumper: Minimum number of dumpers required to avoid idle time of th...
#167 Fill in the Blanks
A coal seam of uniform thickness 12 m is dipping at an angle 30° as shown in the figure. The ultimate pit is demarcated based on allowable instantaneous strippi...
#177 Fill in the Blanks

Related Topics

surface miner production rate mining engineering GATE 2023 production rate calculation surface miner mining engineering production in situ volume calculation surface miner capacity mining engineering production rate

Unique Visitor Count

Total Unique Visitors

Loading......