The shaft-top coordinates of two vertical shafts A and B are given below. The depth of the shaft A and B are 200 m and 149 m, respectively.
The downward gradient of the line joining the bottom of the two shafts in degrees is ____________. (round off to two decimal places)

Correct : 0.90

Similar Questions

The pit bottom in a correlation survey is shown in the figure. Points C and D represent two suspended wires. The bearing of line CD is 286°00'00" and its length...
#207 MCQ
The pit bottom in a correlation survey is shown in the figure. Points C and D represent two suspended wires. The bearing of line CD is 286°00'00" and its length...
#207 MCQ
The pit bottom in a correlation survey is shown in the figure. Points C and D represent two suspended wires. The bearing of line CD is 286°00'00" and its length...