Mining Engineering > GATE 2022 > Mine Transportation
The correct order of pavement layers for a haul road from top to bottom is
A
Wearing course → Base → Sub base → Sub grade
B
Wearing course → Sub base → Base → Sub grade
C
Wearing course → Sub grade → Sub base → Base
D
Wearing course → Base → Sub grade → Sub base

Correct : a

Similar Questions

A transportation system for carrying ore from stock pile to railway siding through an ore bin is shown. The time between failure of each conveyor belt follows a...
#36 Fill in the Blanks
A 35.0 kW motor transmits power to a pulley of 600 mm diameter, which rotates at 400 rpm to drive a flat belt. The tension in the tight side is 2.5 times of the...
#52 Fill in the Blanks
In a small metal mine a battery powered locomotive hauls a train of mine tubs such that: The weight of the train of mine tubs, tonne: 3.0 The coefficient of f...
#165 Fill in the Blanks

Related Topics

pavement layers mining engineering haul road pavement layers GATE Mining Engineering 2022 mining engineering gate pavement layers from top to bottom mining gate question correct order of pavement layers GATE 2022 question 28

Unique Visitor Count

Total Unique Visitors

Loading......