Mining Engineering > GATE 2021 > Mine Economics
Production planning of a small quarry having 3 years of life is shown in the figure. The following information of revenue and cost data are available.
Selling price of ore =Rs.1500/tonne
Ore mining cost=Rs.500/tonne
Waste mining cost =Rs.500/m3
Initial capital = Rs. 1000 million
Discount rate =10%
By neglecting depreciation, salvage value and corporate tax, the NPV of the mining project, in million Rs., is ________.[round off to 2 decimal places]

Ore mining cost=Rs.500/tonne
Waste mining cost =Rs.500/m3
Initial capital = Rs. 1000 million
Discount rate =10%
By neglecting depreciation, salvage value and corporate tax, the NPV of the mining project, in million Rs., is ________.[round off to 2 decimal places]
Correct : 35.50
Similar Questions
The real rate of return from a mining project is 14%. If the inflation rate over the entire life of the mine is 5.5%, then the nominal rate of return in %, is _...
The average ore grade of a copper deposit is 0.9%. The recovery of the metal after processing, smelting and refining is 85%. If the selling price of refined cop...
A mining company makes an initial investment of Rs 200 crore on a project.
By ignoring any other cash-flows, if the NPV of the project becomes Rs. 5.367 cro...