Mining Engineering > GATE 2021 > Mine Surveying
The pit bottom in a correlation survey is shown in the figure. Points C and D represent two suspended wires. The bearing of line CD is 286°00'00" and its length is 4.64 m. The angle CED is measured as 00°00'40". The length of line DE is 5.46 m. Considering the Weisbach triangle method, the bearing of the line CE is
A
286°00'47"
B
285°59'12.9"
C
286°00'40"
D
285°00'47.1"

Explanation

Correct : b

Similar Questions

What is the worst-case time complexity of insertion in an AVL tree?
Question #23 Medium
Which operations on a binary search tree have O(h) complexity?
Question #31 Easy
Compare search complexities of sorted array vs balanced BST.
Question #47 Hard

Related Topics

Data Structures Binary Search Tree Time Complexity Algorithm Analysis Tree Algorithms Computer Science