Mining Engineering > GATE 2021 > Mine Surveying
The pit bottom in a correlation survey is shown in the figure. Points C and D represent two suspended wires. The bearing of line CD is 286°00'00" and its length is 4.64 m. The angle CED is measured as 00°00'40". The length of line DE is 5.46 m. Considering the Weisbach triangle method, the bearing of the line CE is
A
286°00'47"
B
285°59'12.9"
C
286°00'40"
D
285°00'47.1"

Correct : b

Similar Questions

For a dumpy level, the bubble tube has sensitivity of 40" for one division. While taking a staff reading at a distance of 60 m, the bubble is out of centre by 2...
#218 Fill in the Blanks
For a dumpy level, the bubble tube has sensitivity of 40" for one division. While taking a staff reading at a distance of 60 m, the bubble is out of centre by 2...
#218 Fill in the Blanks
For a dumpy level, the bubble tube has sensitivity of 40" for one division. While taking a staff reading at a distance of 60 m, the bubble is out of centre by 2...
#218 Fill in the Blanks

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......