Mining Engineering > GATE 2020 > Mineral Processing
Match the following metals with their corresponding minerals.
A
P-4, Q-2, R-1, S-3
B
P-4, Q-1, R-3,S-2
C
P-3, Q-4, R-1, S-2
D
P-2, Q-3, R-4, S-1

Correct : c

Similar Questions

An underground copper mine sends 2500 tonnes of ore per day to the concentrator plant having an average grade of 1.2% Cu. The plant produces concentrate of 25.0...
#285 Fill in the Blanks
An underground copper mine sends 2500 tonnes of ore per day to the concentrator plant having an average grade of 1.2% Cu. The plant produces concentrate of 25.0...
#285 Fill in the Blanks
An underground copper mine sends 2500 tonnes of ore per day to the concentrator plant having an average grade of 1.2% Cu. The plant produces concentrate of 25.0...
#285 Fill in the Blanks

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......