Mining Engineering > GATE 2019 > Underground Coal Mining
Match the following for coal mining operation:
A
P-C-1, Q-D-3, R-A-2, S-B-4
B
P-C-1, Q-A-3, R-B-4, S-D-2
C
P-C-1, Q-A-4, R-B-3, S-D-2
D
P-B-3, Q-C-2, R-A-1, S-D-4

Correct : b

Similar Questions

A Bord and Pillar panel is developed at a depth of 250 m in a flat coal seam. The vertical stress gradient is 0.027 MPa/m. If the strength of a square pillar is...
#43 Fill in the Blanks
For a continuous miner (CM) panel, the following data are given. Data related to CM A Table: Assume, unit weight of coal is 1.4 tonne/m3 and its swell facto...
#54 Fill in the Blanks
'Critical subsidence has occurred on the surface due to mining of a flat longwall panel at a depth of 200 m. The width of the panel is 150 m. The maximum width...
#87 Fill in the Blanks

Related Topics

coal mining operation GATE Mining Engineering 2019 mining engineering match question coal mining operation diagram GATE 2019 question mining engineering match coal mining operation layout GATE 2019 set 40

Unique Visitor Count

Total Unique Visitors

Loading......