Mining Engineering > GATE 2019 > Aptitude
A worker noticed that the hour hand on the factory clock had moved by 225 degrees during her stay at the factory. For how long did she stay in the factory?
A
3.75 hours
B
4 hours and 15 mins
C
8.5 hours
D
7.5 hours

Correct : d

Similar Questions

The sum and product of two integers are 26 and 165 respectively. The difference between these two integers is _________.
#303 MCQ
The sum and product of two integers are 26 and 165 respectively. The difference between these two integers is _________.
#303 MCQ
The sum and product of two integers are 26 and 165 respectively. The difference between these two integers is _________.
#303 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......