Mining Engineering > GATE 2018 > Underground Coal Mining
An SDL of 1.0 tonne capacity operates with a cycle time of 6 minutes. The dimension of the face is 4 1 m×3 m. Five blasts are conducted per shift with an average pull of 1.2 m. If the density of blasted coal is 0.8 tonne/m3, the time required by the SDL in the shift to lift all the prepared coal in hours is __________.
Correct : 5.6
Similar Questions
A Bord and Pillar panel is developed at a depth of 250 m in a flat coal seam. The vertical stress gradient is 0.027 MPa/m. If the strength of a square pillar is...
For a continuous miner (CM) panel, the following data are given. Data related to CM A Table:
Assume, unit weight of coal is 1.4 tonne/m3 and its swell facto...
'Critical subsidence has occurred on the surface due to mining of a flat longwall panel at a depth of 200 m. The width of the panel is 150 m. The maximum width...