Two machines M1 and M2 are able to execute any of four jobs P, Q, R and S. The machines can perform one job on one object at a time. Jobs P, Q, R and S take 30 minutes, 20 minutes, 60 minutes and 15 minutes each respectively. There are 10 objects each requiring exactly 1 job. Job P is to be performed on 2 objects, Job Q on 3 objects, Job R on 1 object and Job S on 4 objects. What is the minimum time needed to complete all the jobs?
A
2 hours
B
2.5 hours
C
3 hours
D
3.5 hours

Correct : a

Similar Questions

A student was supposed to multiply a positive real number p with another positive real number q. Instead, the student divided p by q. If the percentage error in...
#14 MCQ
If the sum of the first 20 consecutive positive odd numbers is divided by 202, the result is
#15 MCQ
The ratio of the number of girls to boys in class VIII is the same as the ratio of the number of boys to girls in class IX. The total number of students (boys a...
#16 MCQ

Related Topics

GATE Mining Engineering 2017 Q44 GATE Mining 2017 job scheduling puzzle minimum time to complete jobs machine scheduling problem GATE General Aptitude time and work aptitude

Unique Visitor Count

Total Unique Visitors

Loading......