Mining Engineering > GATE 2017 > Transportation
A mining company having three mines A B and C supplies coal to three power plants P, Q and R located close to the mines. The daily production capacities of the three mines in tonnes are 700, 1200, and 1100 respectively. The daily requirements at the power plants in tonnes are 1000, 1000, and 1000 respectively. The transportation costs in rupees per tonne is given in the matrix below:
The total cost of coal transportation in rupees from the three mines to three power plants using the least-cost method is _________.

Correct : 65000 to 67000

Similar Questions

A coal company has three mines which transport coal to four washeries. The daily production from each mine, the demand at each washery and unit transportation c...
#112 Fill in the Blanks
A coal company has three mines which transport coal to four washeries. The daily production from each mine, the demand at each washery and unit transportation c...
#112 Fill in the Blanks
A coal company has three mines which transport coal to four washeries. The daily production from each mine, the demand at each washery and unit transportation c...
#112 Fill in the Blanks

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......