Mining Engineering > GATE 2017 > Underground Coal Mining
A double ended ranging drum shearer is employed in a longwall mine of face length 150 m. The mining height is 3.5 m and depth of the web cut is 0.76 m. The cycle time for unidirectional cutting is 40 min. Considering bulk density of the coal to be 1.4 t/m3, hourly production from the face in tonne is ________.
Correct : 835 to 840
Similar Questions
A Bord and Pillar panel is developed at a depth of 250 m in a flat coal seam. The vertical stress gradient is 0.027 MPa/m. If the strength of a square pillar is...
For a continuous miner (CM) panel, the following data are given. Data related to CM A Table:
Assume, unit weight of coal is 1.4 tonne/m3 and its swell facto...
'Critical subsidence has occurred on the surface due to mining of a flat longwall panel at a depth of 200 m. The width of the panel is 150 m. The maximum width...