Mining Engineering > GATE 2017 > Underground Coal Mining
A double ended ranging drum shearer is employed in a longwall mine of face length 150 m. The mining height is 3.5 m and depth of the web cut is 0.76 m. The cycle time for unidirectional cutting is 40 min. Considering bulk density of the coal to be 1.4 t/m3, hourly production from the face in tonne is ________.
Correct : 835 to 840
Similar Questions
A mine is being developed by bord and pillar method with a gallery size of 4.8 m×2.4 m. The mine operates in 3 shifts per day and 6 faces are blasted per shift....
A mine is being developed by bord and pillar method with a gallery size of 4.8 m×2.4 m. The mine operates in 3 shifts per day and 6 faces are blasted per shift....
A mine is being developed by bord and pillar method with a gallery size of 4.8 m×2.4 m. The mine operates in 3 shifts per day and 6 faces are blasted per shift....