Mechanical Engineering > GATE 2022 SET-2 > Linear Programming
A manufacturing unit produces two products P1 and P2. For each piece of P1 and
P2, the table below provides quantities of materials M1, M2, and M3 required, and
also the profit earned. The maximum quantity available per day for M1, M2 and M3
is also provided. The maximum possible profit per day is ₹__________.

Explanation
Correct : a