Mechanical Engineering > GATE 2022 SET-2 > Machining
Parts P1-P7 are machined first on a milling machine and then polished at a separate machine. Using the information in the following table, the minimum total completion time required for carrying out both the operations for all 7 parts is __________ hours.
A
31
B
33
C
30
D
32

Explanation

Correct : c