Mechanical Engineering > Gate 2020 Set-2 > Quants
It was estimated that 52 men can complete a strip in a newly constructed highway Q.2
connecting cities P and Q in 10 days. Due to an emergency, 12 men were sent to another
project. How many number of days, more than the original estimate, will be required
to complete the strip?
Correct : d
Similar Questions
A rhombus is formed by joining the midpoints of the sides of a unit square.What is the diameter of the largest circle that can be inscribed within the rhombus?
An equilateral triangle, a square and a circle have equal areas.What is the ratio of the perimeters of the equilateral triangle to square to circle?
In a 12-hour clock that runs correctly, how many times do the second, minute, and hour hands of the clock coincide, in a 12-hour duration from 3 PM in a day to...
Total Unique Visitors
Loading......