Mechanical Engineering > GATE 2014 Set-4 > Manufacturing
A cylindrical riser of 6 cm diameter and 6 cm height has to be designed for a sand casting mould for producing a steel rectangular plate casting of 7 cm ร 10 cm ร 2 cm dimensions having the total solidification time of 1.36 minute. The total solidification time (in minute) of the riser is ________.
Correct : 3.0
Similar Questions
Within the Heat Affected Zone (HAZ) in a fusion welding process, the work material undergoes
Two separate slab milling operations, 1 and 2, are performed with identical milling cutters. The depth of cut in operation 2 is twice that in operation 1. The o...
The principle of material removal in Electrochemical machining is
Total Unique Visitors
Loading......