Mechanical Engineering > GATE 2014 Set-1 > Tool Life
If the Taylor’s tool life exponent n is 0.2, and the tool changing time is 1.5 min, then the tool life (in min) for maximum production rate is _______

Correct : 5.9 to 6.1

Similar Questions

After playing _________ hours of tennis, I am feeling _________ tired to walk back.
#1 MCQ
The average of the monthly salaries of M, N and S is ₹ 4000. The average of the monthly salaries of N, S and P is ₹ 5000. The monthly salary of P is ₹ 6000.What...
#2 MCQ
A person travelled 80 km in 6 hours. If the person travelled the first part with a uniform speed of 10 kmph and the remaining part with a uniform speed of 18kmp...
#3 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......