Electrical Engineering > GATE 2025 > Economic Dispatch
Two units rated at 100 MW and 150 MW are enabled for economic load dispatch. When the overall incremental cost is 10,000 Rs./MWh, the units are dispatched to 50 MW and 80 MW respectively. At an overall incremental cost of 10,600 Rs./MWh, the power output of the units are 80 MW and 92 MW, respectively. The total plant MW-output (without overloading any unit) at an overall incremental cost of 11,800 Rs./MWh is ______ (round off to the nearest integer).

Correct : 178

Similar Questions

The incremental cost curves of two generators (Gen A and Gen B) in a plant supplying a common load are shown in the figure. If the incremental cost of supplying...
#115 Fill in the Blanks
The expressions of fuel cost of two thermal generating units as a function of the respective power generation where a is a constant. For a given value of a...
#167 MCQ
As you grow older, an injury to your _________ may take longer to _________.
#3 MCQ

Related Topics

load dispatch electrical engineering GATE Electrical Engineering 2025 incremental cost dispatch power unit dispatch load dispatch problem electrical engineering gate load dispatch calculation GATE load dispatch power plant dispatch

Unique Visitor Count

Total Unique Visitors

Loading......