Electrical Engineering > GATE 2016 SET-2 > Data Interpretation
The following graph represents the installed capacity for cement production (in tonnes) and the actual production (in tonnes) of nine cement plants of a cement company. Capacity utilization of a plant is defined as ratio of actual production of cement to installed capacity. A plant with installed capacity of at least 200 tonnes is called a large plant and a plant with lesser capacity is called a small plant. The difference between total production of large plants and small plants, in tonnes is ________.

Correct : 160

Similar Questions

The number of students passing or failing in an exam for a particular subject are presented in the bar chart above. Students who pass the exam cannot appear f...
#220 MCQ
The revenue and expenditure of four different companies P, Q R and S in 2015 are shown in the figure. If the revenue of company Q in 2015 was 20% more than that...
#340 MCQ
A designer uses marbles of four different colours for his designs. The cost of each marble is the same, irrespective of the colour. The table below shows the pe...
#369 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......