Electrical Engineering > GATE 2015 SET-1 > Load Flow
Determine the correctness or otherwise of the following Assertion [a] and the Reason [r].
Assertion: Fast decoupled load flow method gives approximate load flow solution because it uses several assumptions.
Reason: Accuracy depends on the power mismatch vector tolerance.
A
Both [a] and [r] are true and [r] is the correct reason for [a].
B
Both [a] and [r] are true but [r] is not the correct reason for [a].
C
Both [a] and [r] are false.
D
[a] is false and [r] is true.

Correct : d

Similar Questions

In the figure, the voltages are 𝑣1(𝑑) = 100cos(πœ”π‘‘), 𝑣2(𝑑) = 100cos(πœ”π‘‘ + πœ‹/18) and 𝑣3(𝑑) = 100cos(πœ”π‘‘ + πœ‹/36). The circuit is in sinusoidal steady state, and 𝑅
#77 MCQ
Two generating units rated for 250 MW and 400 MW have governor speed regulations of 6% and 6.4%, respectively, from no load to full load. Both the generating un...
#490 Fill in the Blanks
In a load flow problem solved by Newton-Raphson method with polar coordinates, the size of the Jacobian is 100x100. If there are 20 PV buses in addition to PQ b...
#524 Fill in the Blanks