Electrical Engineering > GATE 2015 SET-1 > Load Flow
Determine the correctness or otherwise of the following Assertion [a] and the Reason [r].
Assertion: Fast decoupled load flow method gives approximate load flow solution because it uses several assumptions.
Reason: Accuracy depends on the power mismatch vector tolerance.
A
Both [a] and [r] are true and [r] is the correct reason for [a].
B
Both [a] and [r] are true but [r] is not the correct reason for [a].
C
Both [a] and [r] are false.
D
[a] is false and [r] is true.

Correct : d

Similar Questions

In the figure, the voltages are 𝑣1(𝑑) = 100cos(πœ”π‘‘), 𝑣2(𝑑) = 100cos(πœ”π‘‘ + πœ‹/18) and 𝑣3(𝑑) = 100cos(πœ”π‘‘ + πœ‹/36). The circuit is in sinusoidal steady state, and 𝑅
#77 MCQ
Two generating units rated for 250 MW and 400 MW have governor speed regulations of 6% and 6.4%, respectively, from no load to full load. Both the generating un...
#490 Fill in the Blanks
In a load flow problem solved by Newton-Raphson method with polar coordinates, the size of the Jacobian is 100x100. If there are 20 PV buses in addition to PQ b...
#524 Fill in the Blanks

Related Topics

fast decoupled load flow method load flow approximation GATE Electrical Engineering 2015 load flow assumptions power mismatch vector load flow accuracy electrical engineering gate load flow method correctness

Unique Visitor Count

Total Unique Visitors

Loading......