Computer Sciences > Gate 2015 Set-3 > Software Engineering
Consider a software program that is artificially seeded with 100 faults. While testing this program, 159 faults are detected, out of which 75 faults are from those artificially seeded faults. Assuming that both real and seeded faults are of same nature and have same distribution, the estimated number of undetected real faults is ____________.
Correct : a
Similar Questions
Consider the basic COCOMO model where E is the effort applied in person-months, D is the development time in chronological months, KLOC is the estimated number...
Consider a software project with the following information domain characteristic for calculation of function point metric.
Number of external inp...
A palindrome is a word that reads the same forwards and backwards. In a game