Civil Engineering > GATE 2022 SET-1 > Transportation Engineering
A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase are 4 s and 50 s, respectively. If the total lost time per phase due to start-up and clearance is 2 s, the effective green time of each phase is _______ s. (in integer)
Correct : 44 to 44