Civil Engineering > GATE 2022 SET-1 > Surveying
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m. The corrected horizontal length (in m) of the line PQ will be
A
342.52
B
349.30
C
356.20
D
350.70

Correct : b