Civil Engineering > GATE 2022 SET-1 > Surveying
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m. The corrected horizontal length (in m) of the line PQ will be
A
342.52
B
349.30
C
356.20
D
350.70

Explanation

Correct : b

Similar Questions

What is the worst-case time complexity of insertion in an AVL tree?
Question #23 Medium
Which operations on a binary search tree have O(h) complexity?
Question #31 Easy
Compare search complexities of sorted array vs balanced BST.
Question #47 Hard

Related Topics

Data Structures Binary Search Tree Time Complexity Algorithm Analysis Tree Algorithms Computer Science