Civil Engineering > GATE 2020 SET-1 > Geotechnical Engineering
A 10 m thick clay layer is resting over a 3 m thick sand layer and is submerged. A fill of 2 m thick sand with unit weight of 20 kN/m3 is placed above the clay layer to accelerate the rate of consolidation of the clay layer.
Coefficient of consolidation of clay is 9 ร 10-2 m2/year and coefficient of volume compressibility of clay is 2.2 ร 10-4 m2/kN. 2 Assume Taylor's relation between time factor and average degree of consolidation.
The settlement (in mm, round off to two decimal places) of the clay layer, 10 years after the construction of the fill, is _______.

Correct : 18.40 to 19.50
Similar Questions
Group I lists the type of gain or loss of strength in soils. Group II lists the property or process responsible for the loss or gain of strength in soils.
T...
A soil sample is subjected to a hydrostatic pressure, ฯ. The Mohr circle for any point in the soil sample would be
A strip footing is resting on the ground surface of a pure clay bed having an undrained cohesion Cu. The ultimate bearing capacity of the footing is equal to
Total Unique Visitors
Loading......