Civil Engineering > GATE 2019 SET-2 > Logical Reasoning
Mohan, the manager, wants his four workers to work in pairs. No pair should work for more than 5 hours. Ram and John have worked together for 5 hours. Krishna and Amir have worked as a team for 2 hours. Krishna does not want to work with Ram. Whom should Mohan allot to work with John, if he wants all the workers to continue working?
A
Amir
B
Krishna
C
Ram
D
None of the three

Correct : b

Similar Questions

Consider the following sentences: All benches are beds. No bed is a bulb. Some bulbs are lamps. Which of the following can be inferred?
#257 MCQ
The old concert hall was demolished because of fears that the foundation would be affected by the construction of the new metro line in the area. Modern technol...
#260 MCQ
Students applying for hostel rooms are allotted rooms in order of seniority. Students already staying in a room will move if they get a room in their preferred...
#261 MCQ

Related Topics

worker pairing puzzle team allocation problem logical reasoning GATE GATE Civil Engineering 2019 GATE 2019 Set-2 Q6 verbal aptitude GATE worker assignment logic Mohan workers pairs

Unique Visitor Count

Total Unique Visitors

Loading......