Civil Engineering > GATE 2019 SET-1 > Surveying
A survey line was measured to be 285.5 m with a tape having a nominal length of 30 m. On checking, the true length of the tape was found to be 0.05 m too short. If the line lay on a slope of 1 in 10, the reduced length (horizontal length) of the line for plotting of survey work would be
Correct : a