The maximum number of vehicles observed in any five minute period during the peak hour is 160. If the total flow in the peak hour is 1000 vehicles, the five minute peak hour factor (round off to 2 decimal places) is _______.

Correct : 0.51 to 0.53

Similar Questions

A super-elevation e is provided on a circular horizontal curve such that a vehicle can be stopped on the curve without sliding. Assuming a design speed v and ma...
#215 MCQ
A runway is being constructed in a new airport as per the International Civil Aviation Organization (ICAO) recommendations. The elevation and the airport refere...
#216 MCQ
Vehicles arriving at an intersection from one of the approach roads follow the Poisson distribution. The mean rate of arrival is 900 vehicles per hour. If a gap...
#224 Fill in the Blanks

Related Topics

peak hour factor traffic engineering GATE Civil Engineering 2019 PHF calculation transportation engineering GATE 2019 Set-1 Q31 maximum vehicles peak hour five minute peak hour factor

Unique Visitor Count

Total Unique Visitors

Loading......