Civil Engineering > GATE 2018 SET-2 > Environmental Engineering
At a small water treatment plant which has 4 filters, the rates of filtration and backwashing are 200 m3/d/m2 and 1000 m3/d/m2, respectively. Backwashing is done for 15 min per day. The maturation, which occurs initially as the filter is put back into service after cleaning, takes 30 min. It is proposed to recover the water being wasted during backwashing and maturation. The percentage increase in the filtered water produced (up to two decimal places) would be _______.

Correct : 7.75 to 7.95

Similar Questions

The reaction rate involving reactants A and B is given by -k[A]α[B]β. Which one of the following statements is valid for the reaction to be a first-order reacti...
#212 MCQ
The wastewater from a city, containing a high concentration of biodegradable organics, is being steadily discharged into a flowing river at a location S. If the...
#213 MCQ
Which one of the following is NOT present in the acid rain?
#214 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......