Civil Engineering > GATE 2018 SET-1 > Environmental Engineering
A city generates 40 × 106 kg of municipal solid waste (MSW) per year, out of which only 10% is recovered/recycled and the rest goes to landfill.
The landfill has a single lift of 3 m height and is compacted to a density of 550 kg/m3.
If 80% of the landfill is assumed to be MSW, the landfill area (in m2, up to one decimal place) required would be _______.
The landfill has a single lift of 3 m height and is compacted to a density of 550 kg/m3.
If 80% of the landfill is assumed to be MSW, the landfill area (in m2, up to one decimal place) required would be _______.
Correct : 27271 to 27274
Similar Questions
The reaction rate involving reactants A and B is given by -k[A]α[B]β. Which one of the following statements is valid for the reaction to be a first-order reacti...
The wastewater from a city, containing a high concentration of biodegradable organics, is being steadily discharged into a flowing river at a location S. If the...
Which one of the following is NOT present in the acid rain?
Total Unique Visitors
Loading......