Civil Engineering > GATE 2017 SET-1 > Logical Reasoning
Two machines M1 and M2 are able to execute any of four jobs P, Q, R and S. The machines can perform one job on one object at a time. Jobs P, Q, R and S take 30 minutes, 20 minutes, 60 minutes and 15 minutes each respectively. There are 10 objects each requiring exactly 1 job. Job P is to be performed on 2 objects, Job Q on 3 objects, Job R on 1 object and Job S on 4 objects. What is the minimum time needed to complete all the jobs?
A
2 hours
B
2.5 hours
C
3 hours
D
3.5 hours

Correct : a

Similar Questions

Consider the following sentences: All benches are beds. No bed is a bulb. Some bulbs are lamps. Which of the following can be inferred?
#257 MCQ
The old concert hall was demolished because of fears that the foundation would be affected by the construction of the new metro line in the area. Modern technol...
#260 MCQ
Students applying for hostel rooms are allotted rooms in order of seniority. Students already staying in a room will move if they get a room in their preferred...
#261 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......