Civil Engineering > GATE 2015 SET-2 > Wastewater Treatment
In a wastewater treatment plant, primary sedimentation tank (PST) designed at an overflow rate of 32.5 m3/day/m2 is 32.5 m long, 8.0 m wide and liquid depth of 2.25 m. If the length of the weir is 75 m, the weir loading rate (in m3/day/m) is _______.

Correct : 112.5

Similar Questions

Which one of the following products is NOT obtained in anaerobic decomposition of glucose?
#982 MCQ
An organic waste is represented as C240O200H180N5S. (Atomic weights: S-32, H-1, C-12, O-16, N-14). Assume complete conversion of S to SO2 while burning. SO2 gen...
#1003 Fill in the Blanks
The wastewater inflow to an activated sludge plant is 0.5 m3/s, and the plant is to be operated with a food to microorganism ratio of 0.2 mg/mg-d. The concentra...
#1070 Fill in the Blanks

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......