Civil Engineering > GATE 2015 SET-2 > Solid Waste Management
A landfill is to be designed to serve a population of 200000 for a period of 25 years. The solid waste (SW) generation is 2 kg/person/day. The density of the un-compacted SW is 100 kg/m3 and a compaction ratio of 4 is suggested. The ratio of compacted fill (i.e., SW + cover) to compacted SW is 1.5. The landfill volume (in million m3) required is _______.

Correct : 13.7

Similar Questions

The following table gives various components of Municipal Solid Waste (MSW) and a list of treatment/separation techniques. _______
#912 MCQ
Which of the following statements is/are TRUE for the Refuse-Derived Fuel (RDF) in the context of Municipal Solid Waste (MSW) management?
#1036 MSQ
The composition and energy content of a representative solid waste sample are given in the table. If the moisture content of the waste is 26%, the energy conten...
#1068 Fill in the Blanks

Related Topics

landfill design civil engineering GATE Civil Engineering 2015 solid waste management landfill volume calculation compaction ratio civil engineering gate landfill design problem waste management engineering

Unique Visitor Count

Total Unique Visitors

Loading......