Civil Engineering > GATE 2015 SET-2 > Solid Waste Management
A landfill is to be designed to serve a population of 200000 for a period of 25 years. The solid waste (SW) generation is 2 kg/person/day. The density of the un-compacted SW is 100 kg/m3 and a compaction ratio of 4 is suggested. The ratio of compacted fill (i.e., SW + cover) to compacted SW is 1.5. The landfill volume (in million m3) required is _______.

Correct : 13.7

Similar Questions

The following table gives various components of Municipal Solid Waste (MSW) and a list of treatment/separation techniques. _______
#912 MCQ
Which of the following statements is/are TRUE for the Refuse-Derived Fuel (RDF) in the context of Municipal Solid Waste (MSW) management?
#1036 MSQ
The composition and energy content of a representative solid waste sample are given in the table. If the moisture content of the waste is 26%, the energy conten...
#1068 Fill in the Blanks

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......