Chemical Engineering > GATE 2021 > Cost Estimation
Operating labor requirements L in the chemical process industry is described in terms of the plant capacity C (kg day-1) over a wide range (103-106) by a power law relationship L=αCβ where α and β are constants. It is known that
L is 60 when C is 2×104
L is 70 when C is 6×104
The value of L when C is 105 kg day-1 is _______ (round off to nearest integer).
L is 60 when C is 2×104
L is 70 when C is 6×104
The value of L when C is 105 kg day-1 is _______ (round off to nearest integer).
Correct : 75
Similar Questions
In the year 2005, the cost of a shell and tube heat exchanger with 68 m2 heat transfer area
was Rs. 12.6 Lakh. Chemical Engineering Index for cost in 2005 was...
The capital cost (CC) of an industrial equipment varies with its capacity (S) as CC ∝ Sβ. The rule-of-thumb value of the exponent β is
The purchase cost of a heat exchanger of 20 m2 area was Rs. 500000 in 2006. What will be the estimated cost (in Rs. to the nearest integer) of a similar heat ex...