Chemical Engineering > GATE 2019 > English Grammar
The expenditure on the project ________ as follows: equipment Rs.20 lakhs, salaries Rs.12 lakhs, and contingency Rs.3 lakhs.
A
break down
B
break
C
breaks down
D
breaks

Correct : c

Similar Questions

Consider the following sentences:(i) Everybody in the class is prepared for the exam.(ii) Babu invited Danish to his home because he enjoys playing chess.Which...
#656 MCQ
Rajiv Gandhi Khel Ratna Award was conferred _______ Mary Kom, a six-time world champion in boxing, recently in a ceremony _______ the Rashtrapati Bhawan (the Pr...
#719 MCQ
Despite a string of poor performances, the chances of K. L. Rahul's selection in the team are _______
#720 MCQ

Related Topics

project expenditure breakdown chemical engineering gate 2019 project cost breakdown project expenses project expenditure chemical engineering questions project cost breakdown GATE chemical engineering 2019

Unique Visitor Count

Total Unique Visitors

Loading......