Two machines M1 and M2 are able to execute any of four jobs P, Q, R and S. The machines can perform one job on one object at a time. Jobs P, Q, R and S take 30 minutes, 20 minutes, 60 minutes and 15 minutes each respectively. There are 10 objects each requiring exactly 1 job. Job P is to be performed on 2 objects, Job Q on 3 objects, Job R on 1 object and Job S on 4 objects. What is the minimum time needed to complete all the jobs?
A
(A) 2 hours
B
(B) 2.5 hours
C
(C) 3 hours
D
(D) 3.5 hours

Correct : a

Similar Questions

All benches are beds. No bed is a bulb. Some bulbs are lamps. Which of the following can be inferred? i. Some beds are lamps. ii. Some lamps are beds.
#1166 MCQ
Students applying for hostel rooms are allotted rooms in order of seniority. Students already staying in a room will move if they get a room in their preferred...
#1170 MCQ
The bar graph below shows the output of five carpenters over one month, each of whom made different items of furniture: chairs, tables, and beds. Conside...
#1173 MCQ

Related Topics

job scheduling chemical engineering GATE Chemical Engineering 2017 job scheduling problem minimum time jobs chemical engineering gate job scheduling chemical GATE 2017 question 64 job execution time

Unique Visitor Count

Total Unique Visitors

Loading......